Tuesday, October 23, 2012

See the difference?

My co-workers thought it would be a good idea if I painted above the porch before the new roof goes on Wednesday.  So I've been working like a dog trying to git 'er done  I don't usually work more than two days in a row due to my carpal tunnel syndrome, and exhaustion.  It took 4 1/2 hours to prime, twice as long as I predicted.  The eaves are very difficult due to the placement of the gutters.  I removed the downspout but am hoping it won't rain and ruin my paint job.  But look at the before, during and after!

I'd like to rid the world of asbestos shingles.
With shingles removed last weekend.


I had to drag my six-foot stepladder up here because I couldn't reach this corner. The cinderblock wasn't enough due to my being vertically challenged.
 





Fall has arrived and is particularly beautiful this year.





Sunday, October 07, 2012

The Last Little Bit

I finished  removing shingles, aluminum trim and nails on the south side.  Below are shots of the kinds of things that are underneath.  I think it's some kind of insect nesting material.

 Can you see the shutter ghosts below?  That's the kitchen window through the forsythia.  The lower window is in the walk-out portion of the basement, above the dryer.
This is above the porch.  I had to remove these shingles because the roof is being replaced this week.


I was scared to climb onto the roof so my sister and nephew stayed with me.  But it was a cinch because the roof is quite flat.  It was hard getting into the corner that meets the higher roof, though.  It was one of those times that a few more inches in height would have come in handy.
 This is the only spot on the whole house where I've found rot.  I'll have to replace the side and bottom trim pieces.

I washed this side down with a hose.  Can you tell the difference?  It was filthy.




The view to my neighbor's beautiful burning bush.